Mostakbal Misr P.S 03

1st Stage - Reclamation
of 300,000 Feddan

Pumping Stattion 03

No. of Pumps: 11 units

Power Rating: 3500 KW/each

Under Construction

Project 1 Project 1 Project 1 Project 1

SHADER AZZAM DRAINAGE P.S

Pumps: CLT 800/1000-GANZ

Q= 2.0 m 3 /sec

H= 6 m

n= 495 RPM

P= 175 KW

QTY: 3 units

Scope of work:

Construction, supply, Commissioning and Startup on 2021

O&M: 2 Years

Barnees Desalination Plant

Location: South Red Sea

Capacity: 4000 m 3 / day

Scope of Work:

Turnkey Construction Project, commissioning and start-up on 2019

Supply & erection of GLS tanks; Different sizes, from 60 m3 to 2000 m 3

Project 2 Project 2 Project 2 Project 2 Project 2 Project 2
Project 2 Project 2 Project 2

Cleopatra Desalination Plant

Location:Marsa Matrouh City

Capacity:3000 m 3 / day

Scope of Work:

Special civil works

Commissioning and start-up on 2015

Robbiki IWW Treatment Plant

Location: 10th of Ramadan City

Capacity: 3000 m3 /day

Scope of Work:

Civil works for the treatment process stages

Commissioning and start-up on 2017

Project 2 Project 2 Project 2
Project 2 Project 2

Fayed Water Pumping Station

5 Split casing units

Q= 630 m 3 / hr

H = 150 m

Type: Apollo - Germany

Scope of work:

Supply equipment

Supervision of erection

Al MAX Pumping Station

Scope of Work:

Supply, erection, and startup,
of 4 gearboxes c/w couplings and instruments

Power: 1200 KW single stage

Speed: 990/196.04 RPM

Gear Ratio: 5,05:1

Mounting: Inclined 45°

Project 2 Project 2
Project 2 Project 2 Project 2 Project 2 Project 2

El Hammam Pipe lines

Location: South of Dubba, Alexandria

Media Irrigation water:

  • First sector: 4 steel pipelines, DN 3000mm,
    Length 1900 m /each
  • Second Sector: 6 steel pipelines, DN 3000 mm,
    Length 1200 m / each
  • Two HDPE pipelines, DN 3000 mm,
    Length 1515 m / each
  • Slowdown chamber,
    1. Concrete Construction:

      Dimensions: 70 m*25 m*8m

      Steel rebars: 450 ton

      Concrete: 3000 m 3

    2. Electromechanical:

      Electric operation Penstocks,

      Size: 3000 mm, 6 Pcs

      2200 mm, 10 Pcs

El Maamora Pipe Lines

Location: Alexandria City

Media: Domestic Wastewater

Main force HDPE pipeline, DN 1000 mm, Length 2100 m

Pipe jacking, DN 1000 mm, Length 60 m

Pipe directional drilling, DN 1000 mm, Length 1200 m

Project 2 Project 2
Project 2 Project 2 Project 2 Project 2 Project 2

El Salam Factory for Polyethylene, PVC, and PP Pipes

It cotains the following:

  • Steel structures hangars ;
    1. 6 hangars with different sizes, for PE,
      PVC, and PP pipes production lines
    2. 4 hangars with varying sizes
      as raw material storage.
    3. 8 hangars with varying sizes for workshop facilities.
  • Two galvanized steel silos ;
    1. Diameter 5.45 m, height 11m
    2. Diameter 3.10m, height 9 m